(1) Project Overview
The Hong Kong Kwong Wah Hospital Reconstruction Project is located at 25 Wo Tat Road, Mong Kok, Yau Tsim Mong District, Hong Kong, with a total floor area of approximately 146,000 square meters. Due to its location in a bustling urban area, the project imposes strict requirements on construction site management and crane operation control. By utilizing BIM technology for CSD coordination design, the project optimized pipeline layout and equipment positioning, conducted construction process simulations, and performed MEP 4D construction simulations to ensure the smooth implementation of the MEP systems.
(2) Application of Technology
Engineering Consulting
1000 users have successfully consulted