Electrical and Mechanical Engineering for the Reconstruction Project of Holy Mother Hospital

Publisher:COIT Release time:2025.08.05

01項目圖.jpg


(1) Project Overview

Marino Holy Mother Hospital is located at 118 Shatin Wan Road, Wong Tai Sin, Kowloon, Hong Kong, with a total area exceeding 60,000 square meters and an estimated net floor area of approximately 16,000 square meters. During the construction process, BIM technology was used to assist in the design of the machine room, and the project team was deeply involved in lighting optimization and control during the design phase. This approach leverages technology to drive high-quality development in hospital construction and contributes to energy conservation and carbon reduction in the engineering and construction sector.


(2) Application of Technology

018-英文.jpg


Prev:Electrical and Mechanical Engineering, Hong Kong Infection Control Centre, North Lantau Hospital Next:Prince of Wales Hospital Reconstruction Project Phase II (Stage I) Electrical and Mechanical Engineering

Engineering Consulting

Consult Now

1000 users have successfully consulted